Heat Input / Thermal Load (MWth)

Ferrybridge 1 · Boiler Flue Gas Path / Combustion

132.0MWth96.0MWth60.0MWth24.0MWth-12.0MWthT-24T-23T-22T-21T-20T-19T-18T-17T-16T-15T-14T-13T-12T-11T-10T-9T-8T-7T-6T-5T-4T-3T-2T-1Flat trend
What this shows

Recent values for Heat Input / Thermal Load. Green band is the agreed operating window (100-115 MWth); amber is the early-warning band before action is required. Source: auto.

Why it's trending this way

Currently in band at 108 MWth. Schedule combustion-control re-tune; grate speed trend creeping.

Historical data
PeriodValueTargetDeltaStatus
T-24111.0MWth0.0MWth+111.0MWthOn / above target
T-23112.5MWth0.0MWth+112.5MWthOn / above target
T-22111.6MWth0.0MWth+111.6MWthOn / above target
T-21113.9MWth0.0MWth+113.9MWthOn / above target
T-20111.0MWth0.0MWth+111.0MWthOn / above target
T-19109.3MWth0.0MWth+109.3MWthOn / above target
T-18108.1MWth0.0MWth+108.1MWthOn / above target
T-17106.4MWth0.0MWth+106.4MWthOn / above target
T-16105.3MWth0.0MWth+105.3MWthOn / above target
T-15105.0MWth0.0MWth+105.0MWthOn / above target
T-14103.9MWth0.0MWth+103.9MWthOn / above target
T-13101.3MWth0.0MWth+101.3MWthOn / above target
T-12101.7MWth0.0MWth+101.7MWthOn / above target
T-11106.7MWth0.0MWth+106.7MWthOn / above target
T-10109.4MWth0.0MWth+109.4MWthOn / above target
T-9111.0MWth0.0MWth+111.0MWthOn / above target
T-8112.6MWth0.0MWth+112.6MWthOn / above target
T-7113.3MWth0.0MWth+113.3MWthOn / above target
T-6115.2MWth0.0MWth+115.2MWthOn / above target
T-5111.4MWth0.0MWth+111.4MWthOn / above target
T-4111.4MWth0.0MWth+111.4MWthOn / above target
T-3110.8MWth0.0MWth+110.8MWthOn / above target
T-2106.5MWth0.0MWth+106.5MWthOn / above target
T-1106.5MWth0.0MWth+106.5MWthOn / above target