Enfinium

Ferrybridge 1

1 area needs action, 1 action overdue.

AI Executive SummaryRefreshing…

Ferrybridge 1 is needs attention, availability 94.1% vs 96% target, 1 area red and 4 amber.

Running well

  • Turbine is healthy and improving.
  • Combustion & flue-gas path is healthy (watch the trend).
  • Generator is healthy (watch the trend).

Worth watching

  • Fuel handling is on the watchlist, crane #2 grab-rope inspection; pull spares forward into the kit.
  • Boiler pressure parts is on the watchlist, confirm next-outage corrosion zone temperature band; bring forward ut inspection.
  • Electrical & control system is on the watchlist, define data feeds for hv/lv boards and grid connection, most kpis limited today.
  • Pumps, fans & rotating kit is on the watchlist, id fan #1 alignment check; trend bearing temp daily this week.

Needs action

  • Water & steam cycle needs action, Vacuum / ACC fans, 2 offline since Mon (owner Plant Reliability Lead, Due in 2 days).
  • 1 action overdue across the plant.
  • Behind plan this month by £109k on revenue.
Generated from sample data.
Available to run
94.1%
target 96%
Energy sent to grid
26.5 GWh
avg 39.5 of 42 MW
Revenue (indicative)
£2.92m
energy × indicative price
Behind plan
-£109k
year-end if trend holds -£1.37m

The four numbers that matter

Plant headline, streamed live.

Available to run
94.1%
Share of time the plant could generate.
Runs as expected
96.4%
How often it runs without unplanned trips.
Unplanned downtime
2.1%
Time lost to faults we didn't schedule.
Planned downtime
312hrs YTD
Time set aside for maintenance.

The 10 areas of the plant

Click any area to drill into its sub-KPIs.

Needs attention

Top risks right now, rotating every few seconds.

Timeline

What's been flagged, started, and resolved.