Useful Heat Output (MWth)
Ferrybridge 1 · Boiler Pressure Parts
What this shows
Recent values for Useful Heat Output. Green band is the agreed operating window (88-96 MWth); amber is the early-warning band before action is required. Source: auto.
Why it's trending this way
Currently in band at 92 MWth. Confirm next-outage corrosion zone temperature band; bring forward UT inspection.
Historical data
| Period | Value | Target | Delta | Status |
|---|---|---|---|---|
| T-24 | 94.8MWth | 0.0MWth | +94.8MWth | On / above target |
| T-23 | 91.5MWth | 0.0MWth | +91.5MWth | On / above target |
| T-22 | 91.2MWth | 0.0MWth | +91.2MWth | On / above target |
| T-21 | 87.6MWth | 0.0MWth | +87.6MWth | On / above target |
| T-20 | 89.5MWth | 0.0MWth | +89.5MWth | On / above target |
| T-19 | 86.3MWth | 0.0MWth | +86.3MWth | On / above target |
| T-18 | 86.9MWth | 0.0MWth | +86.9MWth | On / above target |
| T-17 | 87.1MWth | 0.0MWth | +87.1MWth | On / above target |
| T-16 | 89.0MWth | 0.0MWth | +89.0MWth | On / above target |
| T-15 | 93.0MWth | 0.0MWth | +93.0MWth | On / above target |
| T-14 | 91.9MWth | 0.0MWth | +91.9MWth | On / above target |
| T-13 | 94.1MWth | 0.0MWth | +94.1MWth | On / above target |
| T-12 | 95.1MWth | 0.0MWth | +95.1MWth | On / above target |
| T-11 | 95.3MWth | 0.0MWth | +95.3MWth | On / above target |
| T-10 | 96.2MWth | 0.0MWth | +96.2MWth | On / above target |
| T-9 | 95.4MWth | 0.0MWth | +95.4MWth | On / above target |
| T-8 | 94.5MWth | 0.0MWth | +94.5MWth | On / above target |
| T-7 | 91.5MWth | 0.0MWth | +91.5MWth | On / above target |
| T-6 | 89.5MWth | 0.0MWth | +89.5MWth | On / above target |
| T-5 | 87.6MWth | 0.0MWth | +87.6MWth | On / above target |
| T-4 | 86.9MWth | 0.0MWth | +86.9MWth | On / above target |
| T-3 | 88.8MWth | 0.0MWth | +88.8MWth | On / above target |
| T-2 | 86.3MWth | 0.0MWth | +86.3MWth | On / above target |
| T-1 | 89.6MWth | 0.0MWth | +89.6MWth | On / above target |
