Steam Flow Production Pr 24Hr (t/h)
Ferrybridge 1 · Boiler Pressure Parts
What this shows
Recent values for Steam Flow Production Pr 24Hr. Green band is the agreed operating window (140-152 t/h); amber is the early-warning band before action is required. Source: auto.
Why it's trending this way
Currently in band at 146 t/h. Confirm next-outage corrosion zone temperature band; bring forward UT inspection.
Historical data
| Period | Value | Target | Delta | Status |
|---|---|---|---|---|
| T-24 | 142.2t/h | 0.0t/h | +142.2t/h | On / above target |
| T-23 | 144.5t/h | 0.0t/h | +144.5t/h | On / above target |
| T-22 | 149.3t/h | 0.0t/h | +149.3t/h | On / above target |
| T-21 | 150.6t/h | 0.0t/h | +150.6t/h | On / above target |
| T-20 | 153.6t/h | 0.0t/h | +153.6t/h | On / above target |
| T-19 | 152.7t/h | 0.0t/h | +152.7t/h | On / above target |
| T-18 | 155.8t/h | 0.0t/h | +155.8t/h | On / above target |
| T-17 | 153.7t/h | 0.0t/h | +153.7t/h | On / above target |
| T-16 | 151.5t/h | 0.0t/h | +151.5t/h | On / above target |
| T-15 | 149.7t/h | 0.0t/h | +149.7t/h | On / above target |
| T-14 | 146.3t/h | 0.0t/h | +146.3t/h | On / above target |
| T-13 | 140.7t/h | 0.0t/h | +140.7t/h | On / above target |
| T-12 | 141.8t/h | 0.0t/h | +141.8t/h | On / above target |
| T-11 | 138.1t/h | 0.0t/h | +138.1t/h | On / above target |
| T-10 | 138.6t/h | 0.0t/h | +138.6t/h | On / above target |
| T-9 | 139.1t/h | 0.0t/h | +139.1t/h | On / above target |
| T-8 | 144.3t/h | 0.0t/h | +144.3t/h | On / above target |
| T-7 | 146.5t/h | 0.0t/h | +146.5t/h | On / above target |
| T-6 | 149.1t/h | 0.0t/h | +149.1t/h | On / above target |
| T-5 | 152.6t/h | 0.0t/h | +152.6t/h | On / above target |
| T-4 | 153.6t/h | 0.0t/h | +153.6t/h | On / above target |
| T-3 | 153.6t/h | 0.0t/h | +153.6t/h | On / above target |
| T-2 | 154.3t/h | 0.0t/h | +154.3t/h | On / above target |
| T-1 | 152.3t/h | 0.0t/h | +152.3t/h | On / above target |
