Enfinium

Ferrybridge 2

Running, 2 areas to watch.

AI Executive SummaryRefreshing…

Ferrybridge 2 is running but with items to watch, availability 95.6% vs 96% target, 0 areas red and 2 amber.

Running well

  • Fuel handling is healthy and improving.
  • Turbine is healthy and improving.
  • Water & steam cycle is healthy (watch the trend).

Worth watching

  • Boiler pressure parts is on the watchlist, confirm next-outage corrosion zone temperature band; bring forward ut inspection.
  • Electrical & control system is on the watchlist, define data feeds for hv/lv boards and grid connection, most kpis limited today.

Needs action

  • Behind plan this month by £192k on revenue.
Generated from sample data.
Available to run
95.6%
target 96%
Energy sent to grid
27.0 GWh
avg 40.2 of 42 MW
Revenue (indicative)
£2.97m
energy × indicative price
Behind plan
-£192k
year-end if trend holds -£2.42m

The four numbers that matter

Plant headline, streamed live.

Available to run
95.6%
Share of time the plant could generate.
Runs as expected
97.2%
How often it runs without unplanned trips.
Unplanned downtime
1.6%
Time lost to faults we didn't schedule.
Planned downtime
280hrs YTD
Time set aside for maintenance.

The 10 areas of the plant

Click any area to drill into its sub-KPIs.

Timeline

What's been flagged, started, and resolved.