Running, 1 area to watch.

AI Executive SummaryRefreshing…

Kelvin Lane is running but with items to watch, availability 96.0% vs 95% target, 0 areas red and 1 amber.

Running well

  • Plant is available to run 96.0% of the time, on or above the 95% target.
  • Fuel handling is healthy and improving.
  • Boiler pressure parts is healthy (watch the trend).
  • Turbine is healthy and improving.

Worth watching

  • Water & steam cycle is on the watchlist, quarterly bfp efficiency check, sample within 4 weeks.

Needs action

  • Behind plan this month by £68k on revenue.
Generated from sample data.
Available to run
96.0%
target 95%
Energy sent to grid
19.4 GWh
avg 28.8 of 30 MW
Revenue (indicative)
£2.13m
energy × indicative price
Behind plan
-£68k
year-end if trend holds -£855k

The four numbers that matter

Plant headline, streamed live.

Available to run
96%
Share of time the plant could generate.
Runs as expected
97.6%
How often it runs without unplanned trips.
Unplanned downtime
1.2%
Time lost to faults we didn't schedule.
Planned downtime
230hrs YTD
Time set aside for maintenance.

The 10 areas of the plant

Click any area to drill into its sub-KPIs.

Timeline

What's been flagged, started, and resolved.

Recent events
2 entries
  1. 29 May
    Flag
    Vacuum / ACC fans, 2 offline since Mon
    Water & steam cycle · A-123 · Plant Reliability Lead
  2. 14 Apr
    Incident
    Deaerator level alarm (no impact)