Enfinium

Kemsley

1 area needs action, 1 action overdue.

AI Executive SummaryRefreshing…

Kemsley is needs attention, availability 92.4% vs 95% target, 1 area red and 4 amber.

Running well

  • Turbine is healthy and improving.
  • Combustion & flue-gas path is healthy.
  • Generator is healthy (watch the trend).

Worth watching

  • Boiler pressure parts is on the watchlist, confirm next-outage corrosion zone temperature band; bring forward ut inspection.
  • Water & steam cycle is on the watchlist, quarterly bfp efficiency check, sample within 4 weeks.
  • Electrical & control system is on the watchlist, define data feeds for hv/lv boards and grid connection, most kpis limited today.
  • Pumps, fans & rotating kit is on the watchlist, id fan #1 alignment check; trend bearing temp daily this week.

Needs action

  • Fuel handling needs action, Crane #2 availability 82%, replace grab rope (owner Mechanical Supervisor, Due in 2 days).
  • 1 action overdue across the plant.
  • Behind plan this month by £27k on revenue.
Generated from sample data.
Available to run
92.4%
target 95%
Energy sent to grid
28.6 GWh
avg 42.5 of 46 MW
Revenue (indicative)
£3.08m
energy × indicative price
Behind plan
-£27k
year-end if trend holds -£338k

The four numbers that matter

Plant headline, streamed live.

Available to run
92.4%
Share of time the plant could generate.
Runs as expected
95.1%
How often it runs without unplanned trips.
Unplanned downtime
2.8%
Time lost to faults we didn't schedule.
Planned downtime
340hrs YTD
Time set aside for maintenance.

The 10 areas of the plant

Click any area to drill into its sub-KPIs.

Needs attention

Top risks right now, rotating every few seconds.

Timeline

What's been flagged, started, and resolved.