Useful Heat Output (MWth)
Ferrybridge 2 · Boiler Pressure Parts
What this shows
Recent values for Useful Heat Output. Green band is the agreed operating window (88-96 MWth); amber is the early-warning band before action is required. Source: auto.
Why it's trending this way
Currently in band at 92 MWth. Confirm next-outage corrosion zone temperature band; bring forward UT inspection.
Historical data
| Period | Value | Target | Delta | Status |
|---|---|---|---|---|
| T-24 | 96.6MWth | 0.0MWth | +96.6MWth | On / above target |
| T-23 | 92.9MWth | 0.0MWth | +92.9MWth | On / above target |
| T-22 | 91.8MWth | 0.0MWth | +91.8MWth | On / above target |
| T-21 | 89.8MWth | 0.0MWth | +89.8MWth | On / above target |
| T-20 | 89.3MWth | 0.0MWth | +89.3MWth | On / above target |
| T-19 | 87.9MWth | 0.0MWth | +87.9MWth | On / above target |
| T-18 | 87.3MWth | 0.0MWth | +87.3MWth | On / above target |
| T-17 | 87.0MWth | 0.0MWth | +87.0MWth | On / above target |
| T-16 | 87.3MWth | 0.0MWth | +87.3MWth | On / above target |
| T-15 | 91.3MWth | 0.0MWth | +91.3MWth | On / above target |
| T-14 | 92.2MWth | 0.0MWth | +92.2MWth | On / above target |
| T-13 | 93.2MWth | 0.0MWth | +93.2MWth | On / above target |
| T-12 | 95.8MWth | 0.0MWth | +95.8MWth | On / above target |
| T-11 | 97.3MWth | 0.0MWth | +97.3MWth | On / above target |
| T-10 | 97.1MWth | 0.0MWth | +97.1MWth | On / above target |
| T-9 | 95.6MWth | 0.0MWth | +95.6MWth | On / above target |
| T-8 | 94.5MWth | 0.0MWth | +94.5MWth | On / above target |
| T-7 | 93.3MWth | 0.0MWth | +93.3MWth | On / above target |
| T-6 | 91.0MWth | 0.0MWth | +91.0MWth | On / above target |
| T-5 | 90.4MWth | 0.0MWth | +90.4MWth | On / above target |
| T-4 | 87.3MWth | 0.0MWth | +87.3MWth | On / above target |
| T-3 | 86.0MWth | 0.0MWth | +86.0MWth | On / above target |
| T-2 | 86.4MWth | 0.0MWth | +86.4MWth | On / above target |
| T-1 | 87.2MWth | 0.0MWth | +87.2MWth | On / above target |