Steam Flow Production Pr 24Hr (t/h)
Kelvin Lane · Boiler Pressure Parts
What this shows
Recent values for Steam Flow Production Pr 24Hr. Green band is the agreed operating window (140-152 t/h); amber is the early-warning band before action is required. Source: auto.
Why it's trending this way
Currently in band at 146 t/h. Confirm next-outage corrosion zone temperature band; bring forward UT inspection.
Historical data
| Period | Value | Target | Delta | Status |
|---|---|---|---|---|
| T-24 | 148.4t/h | 0.0t/h | +148.4t/h | On / above target |
| T-23 | 149.4t/h | 0.0t/h | +149.4t/h | On / above target |
| T-22 | 153.0t/h | 0.0t/h | +153.0t/h | On / above target |
| T-21 | 152.2t/h | 0.0t/h | +152.2t/h | On / above target |
| T-20 | 153.0t/h | 0.0t/h | +153.0t/h | On / above target |
| T-19 | 149.8t/h | 0.0t/h | +149.8t/h | On / above target |
| T-18 | 151.2t/h | 0.0t/h | +151.2t/h | On / above target |
| T-17 | 145.5t/h | 0.0t/h | +145.5t/h | On / above target |
| T-16 | 144.7t/h | 0.0t/h | +144.7t/h | On / above target |
| T-15 | 141.1t/h | 0.0t/h | +141.1t/h | On / above target |
| T-14 | 142.0t/h | 0.0t/h | +142.0t/h | On / above target |
| T-13 | 139.3t/h | 0.0t/h | +139.3t/h | On / above target |
| T-12 | 140.3t/h | 0.0t/h | +140.3t/h | On / above target |
| T-11 | 138.8t/h | 0.0t/h | +138.8t/h | On / above target |
| T-10 | 143.3t/h | 0.0t/h | +143.3t/h | On / above target |
| T-9 | 144.0t/h | 0.0t/h | +144.0t/h | On / above target |
| T-8 | 148.1t/h | 0.0t/h | +148.1t/h | On / above target |
| T-7 | 148.8t/h | 0.0t/h | +148.8t/h | On / above target |
| T-6 | 151.6t/h | 0.0t/h | +151.6t/h | On / above target |
| T-5 | 151.1t/h | 0.0t/h | +151.1t/h | On / above target |
| T-4 | 152.4t/h | 0.0t/h | +152.4t/h | On / above target |
| T-3 | 150.5t/h | 0.0t/h | +150.5t/h | On / above target |
| T-2 | 148.4t/h | 0.0t/h | +148.4t/h | On / above target |
| T-1 | 148.1t/h | 0.0t/h | +148.1t/h | On / above target |
