1st Pass Roof Temp (°C)
Parc Adfer · Boiler Flue Gas Path / Combustion
What this shows
Recent values for 1st Pass Roof Temp. Green band is the agreed operating window (580-600 °C); amber is the early-warning band before action is required. Source: auto.
Why it's trending this way
Out of green band, current 612 °C. Schedule combustion-control re-tune; grate speed trend creeping.
Historical data
| Period | Value | Target | Delta | Status |
|---|---|---|---|---|
| T-24 | 630.0°C | 0.0°C | +630.0°C | On / above target |
| T-23 | 625.1°C | 0.0°C | +625.1°C | On / above target |
| T-22 | 614.1°C | 0.0°C | +614.1°C | On / above target |
| T-21 | 612.5°C | 0.0°C | +612.5°C | On / above target |
| T-20 | 594.6°C | 0.0°C | +594.6°C | On / above target |
| T-19 | 598.6°C | 0.0°C | +598.6°C | On / above target |
| T-18 | 587.1°C | 0.0°C | +587.1°C | On / above target |
| T-17 | 581.4°C | 0.0°C | +581.4°C | On / above target |
| T-16 | 594.0°C | 0.0°C | +594.0°C | On / above target |
| T-15 | 597.5°C | 0.0°C | +597.5°C | On / above target |
| T-14 | 594.1°C | 0.0°C | +594.1°C | On / above target |
| T-13 | 613.6°C | 0.0°C | +613.6°C | On / above target |
| T-12 | 617.7°C | 0.0°C | +617.7°C | On / above target |
| T-11 | 634.4°C | 0.0°C | +634.4°C | On / above target |
| T-10 | 648.3°C | 0.0°C | +648.3°C | On / above target |
| T-9 | 634.0°C | 0.0°C | +634.0°C | On / above target |
| T-8 | 647.9°C | 0.0°C | +647.9°C | On / above target |
| T-7 | 630.9°C | 0.0°C | +630.9°C | On / above target |
| T-6 | 615.1°C | 0.0°C | +615.1°C | On / above target |
| T-5 | 598.7°C | 0.0°C | +598.7°C | On / above target |
| T-4 | 586.3°C | 0.0°C | +586.3°C | On / above target |
| T-3 | 579.1°C | 0.0°C | +579.1°C | On / above target |
| T-2 | 579.8°C | 0.0°C | +579.8°C | On / above target |
| T-1 | 589.3°C | 0.0°C | +589.3°C | On / above target |
