Parc Adfer
Running, 1 area to watch.
AI Executive SummaryRefreshing…
Parc Adfer is running but with items to watch, availability 97.2% vs 95% target, 0 areas red and 1 amber.
Running well
- •Plant is available to run 97.2% of the time, on or above the 95% target.
- •Fuel handling is healthy and improving.
- •Boiler pressure parts is healthy and improving.
- •Turbine is healthy and improving.
Worth watching
- •Electrical & control system is on the watchlist, define data feeds for hv/lv boards and grid connection, most kpis limited today.
Needs action
- •Behind plan this month by £100k on revenue.
Generated from sample data.
Available to run
97.2%
target 95%
Energy sent to grid
15.7 GWh
avg 23.3 of 24 MW
Revenue (indicative)
£1.75m
energy × indicative price
Behind plan
-£100k
year-end if trend holds -£1.26m
The four numbers that matter
Plant headline, streamed live.
Available to run
97.2%
Share of time the plant could generate.
Runs as expected
98.4%
How often it runs without unplanned trips.
Unplanned downtime
0.9%
Time lost to faults we didn't schedule.
Planned downtime
196hrs YTD
Time set aside for maintenance.
The 10 areas of the plant
Click any area to drill into its sub-KPIs.
Fuel Handling
greenFuel Bunker Level
71%
Waste Crane 1 Status
96% avail
Waste Crane 2 Status
82% avail
+1 more KPIs →
Owner: Mechanical Supervisor
Boiler Pressure Parts
greenSteam/Feed Diff (Tube Leak)
0.4t/h
Useful Heat Output
92MWth
PSSR Systems
Not yet measured
+2 more KPIs →
Owner: Plant Reliability Lead
Turbine
greenVacuum
76mbar(a)
Gland Steam Status
1OK
Lube Oil System Status
1OK
+2 more KPIs →
Owner: Performance Engineer
WSC (Excluding Boiler)
greenFeedwater System Status
1OK
Main Condensate System Status
1OK
WTP Status
1OK
+5 more KPIs →
Owner: Plant Reliability Lead
Boiler Flue Gas Path / Combustion
greenFouling Diffs
1.42kPa
1st Pass Roof Temp
612°C
S/H Inlet Flue Gas Temp
720°C
+8 more KPIs →
Owner: Ops Shift Manager
Generator
greenExcitation Status
Not yet measured
PD Monitoring
12pC
Reactive Power / Excitation Status
4.2MVAr
+1 more KPIs →
Owner: Electrical Lead
FGT / Emissions / CEMS
greenLime Consumption
312kg/h
Carbon Consumption
42kg/h
Residue Recirculation (F1/F2)
0.78ratio
+6 more KPIs →
Owner: Environmental Lead
Electrical Power Systems / DCS
amberMain Transformer Status
1OK
HV/LV Transformers Status
Not yet measured
EDG Status
Not yet measured
+3 more KPIs →
Owner: Electrical Lead
Rotating Plant
greenCombustion Fans Status
1OK
ID Fan Status
5.8mm/s
Feedwater Pump Status
1OK
+4 more KPIs →
Owner: Mechanical Supervisor
Ash Systems / Bunker / Aux Plant
greenAsh Ext 1 Status
1OK
Ash Ext 2 Status
1OK
Ash Conveyors Status
1OK
+4 more KPIs →
Owner: Ops Shift Manager
Needs attention
Top risks right now, rotating every few seconds.
Timeline
What's been flagged, started, and resolved.
Recent events
2 entries
- 29 MayFlagAux load drift +0.2 MW MTDElectrical & control system · A-114 · Electrical Lead
- 10 AprIncidentPI server failover, no plant impact
