Enfinium
Parc Adfer systems

Boiler Pressure Parts

Parc Adfer · Owner Plant Reliability Lead

green
Headline indicator
0.4t/h · Steam/Feed Diff (Tube Leak)
Green band 0-1 · Amber 1-2 · Red beyond.
Recommended action
Confirm next-outage corrosion zone temperature band; bring forward UT inspection.
Owner: Plant Reliability Lead
Open actions: 0
5 sub-KPIs · automated 4 · manual 0 · mixed 0 · needs definition 1
Data sourceAutomatedManualMixedNeeds definition
Operating detail
Roof temperature
612°C
Superheater temperature
452°C
Corrosion zone status
Elevated risk
T > 446 °C for 28 hrs MTD
Last inspection
Mar 2026
Next inspection due
Sept 2026