Useful Heat Output (MWth)

Parc Adfer · Boiler Pressure Parts

108.1MWth78.6MWth49.1MWth19.6MWth-9.8MWthT-24T-23T-22T-21T-20T-19T-18T-17T-16T-15T-14T-13T-12T-11T-10T-9T-8T-7T-6T-5T-4T-3T-2T-1Trending down -2.0MWth over period
What this shows

Recent values for Useful Heat Output. Green band is the agreed operating window (88-96 MWth); amber is the early-warning band before action is required. Source: auto.

Why it's trending this way

Currently in band at 92 MWth. Confirm next-outage corrosion zone temperature band; bring forward UT inspection.

Historical data
PeriodValueTargetDeltaStatus
T-2496.0MWth0.0MWth+96.0MWthOn / above target
T-2395.0MWth0.0MWth+95.0MWthOn / above target
T-2296.1MWth0.0MWth+96.1MWthOn / above target
T-2194.4MWth0.0MWth+94.4MWthOn / above target
T-2089.5MWth0.0MWth+89.5MWthOn / above target
T-1988.8MWth0.0MWth+88.8MWthOn / above target
T-1889.3MWth0.0MWth+89.3MWthOn / above target
T-1787.9MWth0.0MWth+87.9MWthOn / above target
T-1688.1MWth0.0MWth+88.1MWthOn / above target
T-1588.4MWth0.0MWth+88.4MWthOn / above target
T-1489.7MWth0.0MWth+89.7MWthOn / above target
T-1391.2MWth0.0MWth+91.2MWthOn / above target
T-1293.1MWth0.0MWth+93.1MWthOn / above target
T-1193.4MWth0.0MWth+93.4MWthOn / above target
T-1097.8MWth0.0MWth+97.8MWthOn / above target
T-998.2MWth0.0MWth+98.2MWthOn / above target
T-897.0MWth0.0MWth+97.0MWthOn / above target
T-796.4MWth0.0MWth+96.4MWthOn / above target
T-693.9MWth0.0MWth+93.9MWthOn / above target
T-592.9MWth0.0MWth+92.9MWthOn / above target
T-488.9MWth0.0MWth+88.9MWthOn / above target
T-388.1MWth0.0MWth+88.1MWthOn / above target
T-287.9MWth0.0MWth+87.9MWthOn / above target
T-186.7MWth0.0MWth+86.7MWthOn / above target