Heat Input / Thermal Load (MWth)

Parc Adfer · Boiler Flue Gas Path / Combustion

132.0MWth96.0MWth60.0MWth24.0MWth-12.0MWthT-24T-23T-22T-21T-20T-19T-18T-17T-16T-15T-14T-13T-12T-11T-10T-9T-8T-7T-6T-5T-4T-3T-2T-1Trending up +1.1MWth over period
What this shows

Recent values for Heat Input / Thermal Load. Green band is the agreed operating window (100-115 MWth); amber is the early-warning band before action is required. Source: auto.

Why it's trending this way

Currently in band at 108 MWth. Schedule combustion-control re-tune; grate speed trend creeping.

Historical data
PeriodValueTargetDeltaStatus
T-24105.4MWth0.0MWth+105.4MWthOn / above target
T-23108.8MWth0.0MWth+108.8MWthOn / above target
T-22110.2MWth0.0MWth+110.2MWthOn / above target
T-21112.5MWth0.0MWth+112.5MWthOn / above target
T-20112.0MWth0.0MWth+112.0MWthOn / above target
T-19112.5MWth0.0MWth+112.5MWthOn / above target
T-18114.0MWth0.0MWth+114.0MWthOn / above target
T-17113.0MWth0.0MWth+113.0MWthOn / above target
T-16107.7MWth0.0MWth+107.7MWthOn / above target
T-15107.5MWth0.0MWth+107.5MWthOn / above target
T-14104.4MWth0.0MWth+104.4MWthOn / above target
T-13103.1MWth0.0MWth+103.1MWthOn / above target
T-12101.8MWth0.0MWth+101.8MWthOn / above target
T-11103.8MWth0.0MWth+103.8MWthOn / above target
T-10103.8MWth0.0MWth+103.8MWthOn / above target
T-9104.4MWth0.0MWth+104.4MWthOn / above target
T-8108.1MWth0.0MWth+108.1MWthOn / above target
T-7111.3MWth0.0MWth+111.3MWthOn / above target
T-6109.6MWth0.0MWth+109.6MWthOn / above target
T-5112.8MWth0.0MWth+112.8MWthOn / above target
T-4111.8MWth0.0MWth+111.8MWthOn / above target
T-3115.0MWth0.0MWth+115.0MWthOn / above target
T-2112.4MWth0.0MWth+112.4MWthOn / above target
T-1109.4MWth0.0MWth+109.4MWthOn / above target