Enfinium
← Back to Parc Adfer

Available to run · monthly vs target

Parc Adfer · last 12 months

99.0%97.9%96.8%95.7%94.6%May '25Jun '25Jul '25Aug '25Sep '25Oct '25Nov '25Dec '25Jan '26Feb '26Mar '26Apr '26
What this shows

What share of each month the plant was available to generate. The dashed line is the target agreed with operations. Bars above the line meet target; below means time was lost to forced or planned outages.

Why it's trending this way

Electrical Power Systems / DCS is AMBER, Define data feeds for HV/LV boards and grid connection, most KPIs limited today. Recent: 10 Apr, PI server failover, no plant impact.

Historical data
PeriodValueTargetDeltaStatus
May '2596.5%95.0%+1.5%On / above target
Jun '2596.7%95.0%+1.7%On / above target
Jul '2596.2%95.0%+1.2%On / above target
Aug '2596.6%95.0%+1.6%On / above target
Sep '2596.1%95.0%+1.1%On / above target
Oct '2597.0%95.0%+2.0%On / above target
Nov '2597.3%95.0%+2.3%On / above target
Dec '2597.9%95.0%+2.9%On / above target
Jan '2697.9%95.0%+2.9%On / above target
Feb '2698.1%95.0%+3.1%On / above target
Mar '2698.6%95.0%+3.6%On / above target
Apr '2697.2%95.0%+2.2%On / above target