12-month availability trend
Parc Adfer · rolling
What this shows
Same data as the monthly bars, drawn as a line so the direction of travel is obvious. Watch for sustained dips below the target, short single-month dips are usually planned outages.
Why it's trending this way
Electrical Power Systems / DCS is AMBER, Define data feeds for HV/LV boards and grid connection, most KPIs limited today. Recent: 10 Apr, PI server failover, no plant impact.
Historical data
| Period | Value | Target | Delta | Status |
|---|---|---|---|---|
| May '25 | 96.5% | 95.0% | +1.5% | On / above target |
| Jun '25 | 96.7% | 95.0% | +1.7% | On / above target |
| Jul '25 | 96.2% | 95.0% | +1.2% | On / above target |
| Aug '25 | 96.6% | 95.0% | +1.6% | On / above target |
| Sep '25 | 96.1% | 95.0% | +1.1% | On / above target |
| Oct '25 | 97.0% | 95.0% | +2.0% | On / above target |
| Nov '25 | 97.3% | 95.0% | +2.3% | On / above target |
| Dec '25 | 97.9% | 95.0% | +2.9% | On / above target |
| Jan '26 | 97.9% | 95.0% | +2.9% | On / above target |
| Feb '26 | 98.1% | 95.0% | +3.1% | On / above target |
| Mar '26 | 98.6% | 95.0% | +3.6% | On / above target |
| Apr '26 | 97.2% | 95.0% | +2.2% | On / above target |