99.0%97.9%96.8%95.7%94.6%May '25Jun '25Jul '25Aug '25Sep '25Oct '25Nov '25Dec '25Jan '26Feb '26Mar '26Apr '26Trending up +1.9% over periodtarget 95.0%
What this shows

Same data as the monthly bars, drawn as a line so the direction of travel is obvious. Watch for sustained dips below the target, short single-month dips are usually planned outages.

Why it's trending this way

Electrical Power Systems / DCS is AMBER, Define data feeds for HV/LV boards and grid connection, most KPIs limited today. Recent: 10 Apr, PI server failover, no plant impact.

Historical data
PeriodValueTargetDeltaStatus
May '2596.5%95.0%+1.5%On / above target
Jun '2596.7%95.0%+1.7%On / above target
Jul '2596.2%95.0%+1.2%On / above target
Aug '2596.6%95.0%+1.6%On / above target
Sep '2596.1%95.0%+1.1%On / above target
Oct '2597.0%95.0%+2.0%On / above target
Nov '2597.3%95.0%+2.3%On / above target
Dec '2597.9%95.0%+2.9%On / above target
Jan '2697.9%95.0%+2.9%On / above target
Feb '2698.1%95.0%+3.1%On / above target
Mar '2698.6%95.0%+3.6%On / above target
Apr '2697.2%95.0%+2.2%On / above target