Enfinium
← Back to Skelton Grange

Steam Flow Production Pr 24Hr (t/h)

Skelton Grange · Boiler Pressure Parts

171.7t/h124.9t/h78.0t/h31.2t/h-15.6t/hT-24T-23T-22T-21T-20T-19T-18T-17T-16T-15T-14T-13T-12T-11T-10T-9T-8T-7T-6T-5T-4T-3T-2T-1Trending down -2.9t/h over period
What this shows

Recent values for Steam Flow Production Pr 24Hr. Green band is the agreed operating window (140-152 t/h); amber is the early-warning band before action is required. Source: auto.

Why it's trending this way

Currently in band at 146 t/h. Confirm next-outage corrosion zone temperature band; bring forward UT inspection.

Historical data
PeriodValueTargetDeltaStatus
T-24149.2t/h0.0t/h+149.2t/hOn / above target
T-23150.9t/h0.0t/h+150.9t/hOn / above target
T-22155.2t/h0.0t/h+155.2t/hOn / above target
T-21156.1t/h0.0t/h+156.1t/hOn / above target
T-20154.0t/h0.0t/h+154.0t/hOn / above target
T-19151.7t/h0.0t/h+151.7t/hOn / above target
T-18148.3t/h0.0t/h+148.3t/hOn / above target
T-17147.7t/h0.0t/h+147.7t/hOn / above target
T-16143.7t/h0.0t/h+143.7t/hOn / above target
T-15140.1t/h0.0t/h+140.1t/hOn / above target
T-14138.6t/h0.0t/h+138.6t/hOn / above target
T-13138.9t/h0.0t/h+138.9t/hOn / above target
T-12138.8t/h0.0t/h+138.8t/hOn / above target
T-11142.1t/h0.0t/h+142.1t/hOn / above target
T-10144.2t/h0.0t/h+144.2t/hOn / above target
T-9147.1t/h0.0t/h+147.1t/hOn / above target
T-8151.8t/h0.0t/h+151.8t/hOn / above target
T-7154.7t/h0.0t/h+154.7t/hOn / above target
T-6152.1t/h0.0t/h+152.1t/hOn / above target
T-5153.6t/h0.0t/h+153.6t/hOn / above target
T-4151.9t/h0.0t/h+151.9t/hOn / above target
T-3148.4t/h0.0t/h+148.4t/hOn / above target
T-2145.6t/h0.0t/h+145.6t/hOn / above target
T-1143.2t/h0.0t/h+143.2t/hOn / above target