Skelton Grange
2 areas need action, 2 actions overdue.
AI Executive SummaryRefreshing…
Skelton Grange is needs attention, availability 89.7% vs 94% target, 2 areas red and 4 amber.
Running well
- •Turbine is healthy.
- •Combustion & flue-gas path is healthy (watch the trend).
- •Generator is healthy (watch the trend).
Worth watching
- •Fuel handling is on the watchlist, crane #2 grab-rope inspection; pull spares forward into the kit.
- •Water & steam cycle is on the watchlist, quarterly bfp efficiency check, sample within 4 weeks.
- •Emissions & flue-gas cleaning is on the watchlist, schedule pulse-clean optimisation on bag filters, δp creeping.
- •Electrical & control system is on the watchlist, define data feeds for hv/lv boards and grid connection, most kpis limited today.
Needs action
- •Boiler pressure parts needs action, Superheater temp above corrosion-zone band (owner Plant Reliability Lead, Due in 2 days).
- •Pumps, fans & rotating kit needs action, ID fan #1 vibration trending up (owner Mechanical Supervisor, Due in 2 days).
- •2 actions overdue across the plant.
- •Behind plan this month by £116k on revenue.
Generated from sample data.
Available to run
89.7%
target 94%
Energy sent to grid
29.6 GWh
avg 44.0 of 49 MW
Revenue (indicative)
£3.25m
energy × indicative price
Behind plan
-£116k
year-end if trend holds -£1.46m
The four numbers that matter
Plant headline, streamed live.
Available to run
89.7%
Share of time the plant could generate.
Runs as expected
93.8%
How often it runs without unplanned trips.
Unplanned downtime
3.4%
Time lost to faults we didn't schedule.
Planned downtime
420hrs YTD
Time set aside for maintenance.
The 10 areas of the plant
Click any area to drill into its sub-KPIs.
Fuel Handling
amberFuel Bunker Level
71%
Waste Crane 1 Status
96% avail
Waste Crane 2 Status
82% avail
+1 more KPIs →
Owner: Mechanical Supervisor
Boiler Pressure Parts
redSteam/Feed Diff (Tube Leak)
0.4t/h
Useful Heat Output
92MWth
PSSR Systems
Not yet measured
+2 more KPIs →
Owner: Plant Reliability Lead
Turbine
greenVacuum
76mbar(a)
Gland Steam Status
1OK
Lube Oil System Status
1OK
+2 more KPIs →
Owner: Performance Engineer
WSC (Excluding Boiler)
amberFeedwater System Status
1OK
Main Condensate System Status
1OK
WTP Status
1OK
+5 more KPIs →
Owner: Plant Reliability Lead
Boiler Flue Gas Path / Combustion
greenFouling Diffs
1.42kPa
1st Pass Roof Temp
612°C
S/H Inlet Flue Gas Temp
720°C
+8 more KPIs →
Owner: Ops Shift Manager
Generator
greenExcitation Status
Not yet measured
PD Monitoring
12pC
Reactive Power / Excitation Status
4.2MVAr
+1 more KPIs →
Owner: Electrical Lead
FGT / Emissions / CEMS
amberLime Consumption
312kg/h
Carbon Consumption
42kg/h
Residue Recirculation (F1/F2)
0.78ratio
+6 more KPIs →
Owner: Environmental Lead
Electrical Power Systems / DCS
amberMain Transformer Status
1OK
HV/LV Transformers Status
Not yet measured
EDG Status
Not yet measured
+3 more KPIs →
Owner: Electrical Lead
Rotating Plant
redCombustion Fans Status
1OK
ID Fan Status
5.8mm/s
Feedwater Pump Status
1OK
+4 more KPIs →
Owner: Mechanical Supervisor
Ash Systems / Bunker / Aux Plant
greenAsh Ext 1 Status
1OK
Ash Ext 2 Status
1OK
Ash Conveyors Status
1OK
+4 more KPIs →
Owner: Ops Shift Manager
Needs attention
Top risks right now, rotating every few seconds.
Timeline
What's been flagged, started, and resolved.
Recent events
13 entries
- 29 MayFlagAux load drift +0.2 MW MTDElectrical & control system · A-120 · Electrical Lead
- 29 MayFlagBag-filter ΔP creep, pulse clean optimisationEmissions & flue-gas cleaning · A-119 · Environmental Lead
- 29 MayFlagVacuum / ACC fans, 2 offline since MonWater & steam cycle · A-118 · Plant Reliability Lead
- 29 MayFlagCrane #2 availability 82%, replace grab ropeFuel handling · A-115 · Mechanical Supervisor
- 27 MayUnderwayWork started, ID fan #1 vibration trending upPumps, fans & rotating kit · Mechanical Supervisor
- 27 MayUnderwayWork started, Superheater temp above corrosion-zone bandBoiler pressure parts · Plant Reliability Lead
- 23 MayFlagID fan #1 vibration trending upPumps, fans & rotating kit · A-121 · Mechanical Supervisor
- 23 MayFlagSuperheater temp above corrosion-zone bandBoiler pressure parts · A-116 · Plant Reliability Lead
- 20 MayFlagBearing temp +4 °C in 14dPumps, fans & rotating kit · A-122 · Mechanical Supervisor
- 20 MayFlagBring forward UT inspectionBoiler pressure parts · A-117 · Plant Reliability Lead
- 27 AprIncidentBag-filter ΔP creep
- 20 AprIncidentID fan #2 vibration trip