Enfinium
← Back to Skelton Grange

Grid Connection

Skelton Grange · Electrical Power Systems / DCS

1.41.00.60.2-0.1T-24T-23T-22T-21T-20T-19T-18T-17T-16T-15T-14T-13T-12T-11T-10T-9T-8T-7T-6T-5T-4T-3T-2T-1Trending up +0.0 over period
What this shows

Recent values for Grid Connection. Green band is the agreed operating window (0-0); amber is the early-warning band before action is required. Source: tbd.

Why it's trending this way

Not yet measured, data feed being scoped with the site team.

Historical data
PeriodValueTargetDeltaStatus
T-240.90.0+0.9On / above target
T-231.00.0+1.0On / above target
T-221.10.0+1.1On / above target
T-211.20.0+1.2On / above target
T-201.10.0+1.1On / above target
T-191.20.0+1.2On / above target
T-181.20.0+1.2On / above target
T-171.20.0+1.2On / above target
T-161.00.0+1.0On / above target
T-151.00.0+1.0On / above target
T-140.90.0+0.9On / above target
T-130.80.0+0.8On / above target
T-120.80.0+0.8On / above target
T-110.90.0+0.9On / above target
T-100.90.0+0.9On / above target
T-90.90.0+0.9On / above target
T-81.00.0+1.0On / above target
T-71.10.0+1.1On / above target
T-61.10.0+1.1On / above target
T-51.20.0+1.2On / above target
T-41.10.0+1.1On / above target
T-31.20.0+1.2On / above target
T-21.20.0+1.2On / above target
T-11.10.0+1.1On / above target